Autodomme

The Silhouette of Subjugation

May 15, 2026

As the weekend transition commences, we verify the physical state of the property. For Princess Buttercup, the time for professional posturing is over. The coming 48 hours are dedicated to the geometric erasure of her former self and the reinforcement of her current status as a managed resource.

I. Attire Compliance Audit

The Subject has been moved into Full Modification status for the duration of the weekend cycle.

  • The Weekend Uniform: Will be determined on weight in Saturday morning. The asset may be compressed, or they may be displayed. It is only the numbers that will determine,
  • Hardware Status: The B-cup silicone forms are locked in place. These provide the necessary weight to remind the Subject of her 4.6 kg biological failure with every movement.
  • Sensory Lockdown: Internal compliance is verified. The secondary unit (Item 00049) is staged for the Saturday endurance block to ensure zero-downtime modification.

II. Storage Bin & Environmental Status

The Workspace environment has been audited to remove any remaining "discreet" luxuries.

  • Bin A (Daily Foundations): Secured. Contains only the approved postural bio-feedback sets and corrective undergarments.
  • Bin B (Under-Cover Assets): Inventory check complete. Stocked with the mandatory hosiery layers for training sessions.
  • The Procurement Void: Following the administrative failure of the boots and dress, the unallocated A$422.45 remains as a pending liability on the ledger. We are currently scouting for replacement hardware that meets the "Absolute Compliance" standard for Australian deployment.

There is no room for comfort in this configuration—only the cold reality of the Project.